We focus on the entire process of the project, concept through completion

We are a leading company, serving clients around the globe

Our experience combined with our dedication to providing outstanding customer service and quality projects, has helped Byron become a leader in construction management

Work: Detailed Design

Client- MSIDC

Project Name: EPC-42-A Improvement of road murtizapur dahigav gudadhi umari akola SH-284 km 0/00 to km 36/ 800-part murtizapur to akola and akola malkapur kanshivani morgaon kakad MDR-19 km 0/00 to km 24/500 and NH -6 to kolambi patur nandapur part NH -6 kolambi to borgaon khurd km 0/00 to km 7/00. (Under EPC).

Work: DPR

Client- MSRDC

Project Name: Upgradation of existing state highway (sh14) from yavatmal to badnera to four lanes divided carriageway with paved shoulders.

Yavatmal to samruddhi (section-i)

Work: Detailed Design

Client- MSIDC

Project Name: EPC- Improvement of satara koregaon mhaswad pandharpur mohol vairag road, sh-141, km. 183/580 το 217/580, tal. Mohol & barshi. Dist. Solapur (total length – 34.00km). & Improvement of mohol tambole saundane warkute aundhi wadedegaon begampur mdr-146, κμ. 0/000 το 28/400, tal. Mohol. Dist. Solapur (total length-28.40km)

Work: DPR

Client- MSRDC

Project Name: Upgradation of existing state highway (sh14) from yavatmal to badnera to four lanes divided carriageway with paved shoulders.

Samruddhi to badnera (section-ii)

Work: Detailed Design

Client- MSIDC

Project Name: EPC- Improvement of satara koregaon mhaswad pandharpur mohol vairag road, sh-141, km. 183/580 το 217/580, tal. Mohol & barshi. Dist. Solapur (total length – 34.00km). & Improvement of mohol tambole saundane warkute aundhi wadedegaon begampur mdr-146, κμ. 0/000 το 28/400, tal. Mohol. Dist. Solapur (total length-28.40km)

Work: Detailed Design

Client- MSIDC

Project Name: EPC-42-A Improvement of road murtizapur dahigav gudadhi umari akola SH-284 km 0/00 to km 36/ 800-part murtizapur to akola and akola malkapur kanshivani morgaon kakad MDR-19 km 0/00 to km 24/500 and NH -6 to kolambi patur nandapur part NH -6 kolambi to borgaon khurd km 0/00 to km 7/00. (Under EPC).

Work: DPR

Client- MSRDC

Project Name: Upgradation of existing state highway (sh14) from yavatmal to badnera to four lanes divided carriageway with paved shoulders.

Samruddhi to badnera (section-ii)

Work: DPR

Client- MSRDC

Project Name: Upgradation of existing state highway (sh14) from yavatmal to badnera to four lanes divided carriageway with paved shoulders.

Yavatmal to samruddhi (section-i)

Sr. No.Our ClientAuthorityServiceProject Name
1Tejas SuperStructureJAWAHARLAL NEHRU PORT AUTHORITYPre Bid EngineeringFreelancing work Prebid Quantity of Detailed Project Report for a Proposed ROB to coastal berth & landing jetty. at JNPA, Sheva, Raigad, Maharashtra
2Tejas SuperStructureNHAI Karnataka DIVPre Bid EngineeringPrebid Quantity of Construction of 4 Lane ROB at Km 40+134 on NH-150 (Kalaburagi-Wadi-Yadgiri Section) including Balance approach work from Km 39+580 to Km 40+065 and from Km 40+203 to Km 40+612 of NH-150 in Kalaburagi District of Karnataka State in EPC mode under NH(O) Annual Plan 2024-25
3Tejas SuperStructureMORTH, Karnataka DIVPre Bid EngineeringConstruction of 4 Lane ROB at Km 40+134 on NH-150 (Kalaburagi-Wadi-Yadgiri Section) including Balance approach work from Km 39+580 to Km 40+065 and from Km 40+203 to Km 40+612 of NH-150 in Kalaburagi District of Karnataka State in EPC mode under NH(O) Annual Plan 2024-25
4Tejas SuperStructureNHPWD MaharashtraPre Bid EngineeringCONSTRUCTION OF ROB WITH APPROACHES AT NERAL KM 522/20-22. (IN LIEU OF LC-20 AT KMS. 522/20-22 BETWEEN NANDURA-JALAMB STATIONS AT BHUSAWAL-BADNERA SECTION OF BHUSAWAL DIVISION).
5Real Strength InfraMORTH, Maharashtra DIVPre Bid EngineeringWidening, Reconstruction & Upgradation to 2 Lane with Paved Shoulder Configuration for the work of Bhimashankar-Taleghar-Wada-Rajgurunagar Road (NH-60 SPUR) from Design KM 2+928 to KM 63+378 (Design Length=60.450KM) in State of Maharashtra on Hybrid Annuity Mode
6Real Strength InfraMORTH, Maharashtra DIVPre Bid EngineeringWidening, Reconstruction & Upgradation to 2 Lane with Paved Shoulder configuration for the work of Junnar-Ghodegaon-Taleghar Road (NH-61 Spur) from KM 13+880 to KM 69+820 (Design Length=55.940KM) in State of Maharashtra on Hybrid Annuity Mode
7INFRATECH ENGINEERING SERVICESeM/s. GIPPL -PRL (JV)GOYALA INFRA PROJECTS PVT. LTD. JV WITH PRL PROJECTS & INFRASTRUCTURE LTD.Detailed DesignConstruction of Vehicular Underpass (VUP) @ CH. 210592 (YAWALI) INCLUDING SVUP AT CH. 211139 ON PUNE SOLAPUR PKG II SECTION OF NH65
8INFRATECH ENGINEERING SERVICESeM/s. GIPPL -PRL (JV)GOYALA INFRA PROJECTS PVT. LTD. JV WITH PRL PROJECTS & INFRASTRUCTURE LTD.Detailed DesignConstruction of Vehicular Underpass (VUP) @ ch. 36+585 along with street light work on Solapur Yedshi section of NH-52
9INFRATECH ENGINEERING SERVICESeM/s. GIPPL -PRL (JV)GOYALA INFRA PROJECTS PVT. LTD. JV WITH PRL PROJECTS & INFRASTRUCTURE LTD.Detailed DesignConstruction of Service Road from Ch.101+750 to 102+050 BHS
10INFRATECH ENGINEERING SERVICESeM/s. GIPPL -PRL (JV)GOYALA INFRA PROJECTS PVT. LTD. JV WITH PRL PROJECTS & INFRASTRUCTURE LTD.Detailed DesignConstruction of ROB at Bhaiya Chowk
11TRANZTECH SOLUTIONSMINISTRY OF ROAD TRANSPORT & HIGHWAYS (MoRT&H) (GOVERNMENT OF INDIA) SUPERINTENDING ENGINEER (R&B), NATIONAL HIGHWAYS CIRCLE, NIZAMABAD, TELANGANA STATEDetailed DesignImprovement to Kalamnuri MSH-07 To NH-161 to Dhanora Dholkyachi Wadi Wakodi Bahbali Belmandal Yehalegaon (Tukaram) to SH-259 Dist. Hingoli MDR-7 km. 0/000 to 29/056” (Under EPC).
12TRANZTECH SOLUTIONSPUBLIC WORK DEPARTMENT GOVT. OF MAHARASHTRA PUBLIC WORK DIVISION ARVIDetailed DesignWidening, Reconstruction & Up gradation to 2 Lane with Paved Shoulder configuration for the work of Junnar-Ghodegaon-Taleghar Road (NH-61 Spur) from KM 13+880 to KM 69+820 (Design Length=55.940Km) in state of Maharashtra on Hybrid Annuity Mode
13TRANZTECH SOLUTIONSMH PWDDetailed DesignEPC 29- “Improvement to Kalamnuri MSH-07 to NH-161 to Dhanora Dholkyachi Wadi Wakodi Bahbali Belmandal Yehalegaon (Tukaram) to SH-259 Dist. Hingoli MDR-7 km. 0/000 to 29/056”(Under EPC).
14VISHVARATNA INFRASOLUTIONS PVT. LTD.MSIDCDetailed DesignEPC-42A “Improvement of Akola Murtizapur National Highway Daptiy Gudhali Umari Akola SH-284 Km 0/00 to Km 36/800 part Murtizapur to Akola and Akola Malkapur Kanshiwani Morgaon Kakad MDR-19 Km 0/00 to Km 24/500 and NH -6 to Kolambi Patur Nandapur Part NH -6 Kolambi to Borgaon Khurd Km 0/00 to Km 7/00. (Under EPC).
15VISHVARATNA INFRASOLUTIONS PVT. LTD.MH PWDDetailed DesignEPC 36 - Improvement of Kharda Chausala Salegaon Malegaon Bori Sawargaon Lokhindi Sawargaon Road SH 64 Km 71/000 to 98/930 (Part – Malegaon to Lokhindi Sawargaon) Taluka-Kaij and District - Beed
16VISHVARATNA INFRASOLUTIONS PVT. LTD.MH PWDDetailed DesignEPC-38 Improvement of Mandwa- Mandekhed-Nathara-Kaudgaon RoadSH 235 Km 0/000 to 42/000 Taluka-Parali and District -Beed
17Krushnaji ConstroMH PWDDetailed DesignDetailed Design of Structures in EPC 54- “Improvements to Kanhe Phata Talev Kusur Khind Suwala Road MDR22 Km 1/00 to 43/00 Tal Maval Dist. Pune”
18BenchMark Engicon Solutions Pvt. Ltd.MH PWDDetailed DesignRehabilitation & Up-Gradation To 2-Lanes with Paved Shoulder Configuration of Mhaud-Sangola of NH-9656 Chainage From km.159.400 to161.900 & 162.400 to181.900 (Design Chainage from km.32.300 to km34.800 & km35.300 to km56.860) in the State of Maharashtra on EPC Mode
19BenchMark Engicon Solutions Pvt. Ltd.MH PWDDetailed DesignEPC 11 - Improvement of MDR-84 Road from NH-9 (Pune-Solapur) To Khadki – Paravadehi – Shepthgalade – Lakadi – Nimboli – Bhawani Nagar- Sasan Kurwii-, New Construction, Widening and Strengthening of existing carriageway in the section of MDR-84 from Km 00/000 to 21/900 (Length- 21.90 km) to two lanes with paved shoulders standards in Tal. Indapur Dist. Pune, Maharashtra on Engineering, Procurement & Construction (EPC) Mode
20Shivthirth Engineering Services PVT LTD-DPRKrale to Kolhapur Road
21Shivthirth Engineering Services PVT LTDMSRDCDPRUPGRADATION OF EXISTING STATE HIGHWAY (SH14) FROM YAVATMAL TO BADNERA TO FOUR LANES DIVIDED CARRIAGEWAY WITH PAVED SHOULDERS
22Shivthirth Engineering Services PVT LTDMSRDCDPRUPGRADATION OF EXISTING STATE HIGHWAY (SH14) FROM YAVATMAL TO BADNERA TO FOUR LANES DIVIDED CARRIAGEWAY WITH PAVED SHOULDERS

Renewable Energy

Byron’s technological and product-led innovation is powering a greener tomorrow across six continents.